Machine Learning-Based Prediction of Construction Project Delays in Public Building Projects in Nigeria
DOI:
https://doi.org/10.5281/zenodo.21486288Keywords:
Machine learning; Construction delays; Public building projects; XGBoost; Project risk predictionAbstract
Construction project delays remain one of the major challenges affecting the successful delivery of public infrastructure in Nigeria, resulting in significant cost overruns, schedule extensions, and reduced project performance. This study developed and evaluated a machine learning framework for predicting delays in public building projects using historical project data from 1,200 completed projects executed between 2015 and 2022. Twenty-three project characteristics, including contract sum, project duration, payment delay, material price increase, contractor experience, project complexity, and design modifications, were used as predictor variables. The dataset was preprocessed through missing value imputation, outlier treatment, feature engineering, and standardization before model development. Six supervised machine learning algorithms comprising Logistic Regression, Decision Tree, Random Forest, Support Vector Machine, Artificial Neural Network, and Extreme Gradient Boosting (XGBoost) were trained and evaluated using five-fold cross-validation. Results showed that 67.2% of the projects experienced schedule delays, with an average delay duration of 182.4 days. Correlation and feature importance analyses identified payment delay, project complexity, and material price escalation as the most influential predictors of project delay. Comparative evaluation indicated that the XGBoost model achieved the highest predictive performance with an accuracy of 96.67%, precision of 96.34%, recall of 96.08%, F1-score of 96.21%, and ROC-AUC of 0.989, outperforming the Artificial Neural Network (95.42%), Random Forest (93.75%), Support Vector Machine (91.25%), Decision Tree (87.08%), and Logistic Regression (84.58%). The optimized model correctly classified 232 out of 240 testing observations and demonstrated excellent robustness with a cross-validation standard deviation of only 0.34%. The developed framework provides an interpretable and highly reliable decision-support tool capable of identifying high-risk projects before significant schedule overruns occur, thereby supporting proactive project management, efficient resource allocation, and improved delivery of public building projects in Nigeria.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Muritala Olamilekan Issa (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.
How to Cite
Similar Articles
- Mohammed Kudu Abubakar, Balogun Monsurat O, Lambe Adesina M., Abdul-Waheed Musa, Ogunbiyi Olalekan, Jimada-Ojuolape Bilkisu, A Hybridized Artificial Neural Network and Support Vector Machine Model in Power Transmission Fault Detection , Communication In Physical Sciences: Vol. 13 No. 7 (2026): Volume 13, Issue 7
- Osondu Onwuegbuchi, Abdulaziz Olaleye Ibiyeye, Joy Nnenna Okolo, Samuel Adetayo Adeniji, Cybersecurity Risks in the Fintech Ecosystem: Regulatory and Technological Perspectives , Communication In Physical Sciences: Vol. 9 No. 4 (2023): VOLUME 9 ISSUE 4
- Paschal O. Iniaghe, Chimere Ezekwe, Per- and Polyfluoroalkyl Substances and Waste Management in Nigeria: A Review , Communication In Physical Sciences: Vol. 13 No. 3 (2026): Volume 13 Issue 3
- Aminat Folorunso Ajeboriogbon, Benjamin O. Adewuyi, Oluyemi O. Daramola, Heavy metal contamination as a major environmental and public health concern - A Review , Communication In Physical Sciences: Vol. 13 No. 4 (2026): Volume 13 Issue 4
- Chinyan Blessing, Sharon Oluwaseun, Taiwo Ruth Owoeye, Arti Raikwar, Beyond Automation: Data-Driven Financial Process Optimization and Organizational Transformation in Financial Services , Communication In Physical Sciences: Vol. 12 No. 8 (2025): VOLUME 12 ISSUE 8
- Joy Nnenna Okolo, A Systematic Analysis of Artificial Intelligence and Data Science Integration for Proactive Cyber Defense: Exploring Methods, Implementation Obstacles, Emerging Innovations, and Future Security Prospects , Communication In Physical Sciences: Vol. 7 No. 4 (2021): VOLUME 7 ISSUE 4
- Forward Nsama, Development of Sustainable Finance Strategies for Climate-Resilient Infrastructure Investments Across U.S. States , Communication In Physical Sciences: Vol. 12 No. 6 (2025): VOLUME 12 ISSUE 6
- Ukeme Nsikak Essien, Advances in Precision Forestry: Integrating Remote Sensing, AI, and Mechanized Operations for Sustainable Forest Management , Communication In Physical Sciences: Vol. 12 No. 8 (2025): VOLUME 12 ISSUE 8
- Yakubu Mohammed, Habu Tela Abba, Mustapha Suleiman Gimba, Determination of the Gross Alpha and Beta Activity Concentration in Groundwater from Damaturu , Communication In Physical Sciences: Vol. 8 No. 2 (2022): VOLUME 8 ISSUE 2
- Muhammad Bello, Musa Bello, Dunah Lawissense Godfrey, Effect of Multimedia-Enriched Lecture Method on Retention Among Secondary School Physics Students in Kano Metropolis, Nigeria , Communication In Physical Sciences: Vol. 12 No. 3 (2025): VOLUME 12 ISSUE 3
You may also start an advanced similarity search for this article.