Machine Learning-Based Prediction of Construction Project Delays in Public Building Projects in Nigeria
DOI:
https://doi.org/10.4314/Keywords:
Machine learning; Construction delays; Public building projects; XGBoost; Project risk predictionAbstract
Construction project delays remain one of the major challenges affecting the successful delivery of public infrastructure in Nigeria, resulting in significant cost overruns, schedule extensions, and reduced project performance. This study developed and evaluated a machine learning framework for predicting delays in public building projects using historical project data from 1,200 completed projects executed between 2015 and 2022. Twenty-three project characteristics, including contract sum, project duration, payment delay, material price increase, contractor experience, project complexity, and design modifications, were used as predictor variables. The dataset was preprocessed through missing value imputation, outlier treatment, feature engineering, and standardization before model development. Six supervised machine learning algorithms comprising Logistic Regression, Decision Tree, Random Forest, Support Vector Machine, Artificial Neural Network, and Extreme Gradient Boosting (XGBoost) were trained and evaluated using five-fold cross-validation. Results showed that 67.2% of the projects experienced schedule delays, with an average delay duration of 182.4 days. Correlation and feature importance analyses identified payment delay, project complexity, and material price escalation as the most influential predictors of project delay. Comparative evaluation indicated that the XGBoost model achieved the highest predictive performance with an accuracy of 96.67%, precision of 96.34%, recall of 96.08%, F1-score of 96.21%, and ROC-AUC of 0.989, outperforming the Artificial Neural Network (95.42%), Random Forest (93.75%), Support Vector Machine (91.25%), Decision Tree (87.08%), and Logistic Regression (84.58%). The optimized model correctly classified 232 out of 240 testing observations and demonstrated excellent robustness with a cross-validation standard deviation of only 0.34%. The developed framework provides an interpretable and highly reliable decision-support tool capable of identifying high-risk projects before significant schedule overruns occur, thereby supporting proactive project management, efficient resource allocation, and improved delivery of public building projects in Nigeria.
Published
Issue
Section
License
Copyright (c) 2022 Muritala Olamilekan Issa (Author)

This work is licensed under a Creative Commons Attribution 4.0 International License.
How to Cite
Similar Articles
- Adebayo Adegbenro, Arinze Madueke, Aniedi Ojo, Cynthia Alabi, AI-Driven Wealth Advisory: Machine Learning Models for Personalized Investment Portfolios and Risk Optimization , Communication In Physical Sciences: Vol. 8 No. 4 (2022): VOLUME 8 ISSUE 4
- Divine Ikechukwu Duruobioma, Enhancing Safety Performance in The U.S. Multi-Employer Construction Projects Through Integrated Digital Safety Governance Frameworks for Injury and Fatality Prevention , Communication In Physical Sciences: Vol. 13 No. 6 (2026): VOLUME 13 Issue 6
- Yisa Adeniyi Abolade, Bridging Mathematical Foundations and Intelligent Systems: A Statistical and Machine Learning Approach , Communication In Physical Sciences: Vol. 9 No. 4 (2023): VOLUME 9 ISSUE 4
- Aramide Ajayi, Anuoluwapo Rogers, Emmanuel Egyam, Justin Nnam, Chidinma Jonah, Leveraging Machine Learning for Predictive Analytics in Mergers and Acquisitions: Valuation, Risk Assessment, and Post-Merger Performance , Communication In Physical Sciences: Vol. 8 No. 4 (2022): VOLUME 8 ISSUE 4
- Mujeeb Abdulrazaq, Rare-Event Prediction in Imbalanced Data: A Unified Evaluation and Optimization Framework for High-Risk Systems , Communication In Physical Sciences: Vol. 9 No. 4 (2023): VOLUME 9 ISSUE 4
- Oyakojo Emmanuel Oladipupo, Abdulahi Opejin, Jerome Nenger, Ololade Sophiat Alaran, Coastal Hazard Risk Assessment in a Changing Climate: A Review of Predictive Models and Emerging Technologies , Communication In Physical Sciences: Vol. 12 No. 6 (2025): VOLUME 12 ISSUE 6
- Nweze Rosemary Chika Nweze, Confidence Ifeoma Odoh, Nneka Maryann Okafor, Prediction of Infectious Diseases using Machine Learning: A Case Study of Tuberculosis in Nigeria , Communication In Physical Sciences: Vol. 13 No. 5 (2026): VOLUME 13 ISSUE 5
- Felix Chinedu Ugwu, Aimola, Amos Ayodele, Rita, Mizilafe Uwumagbe, Badams Sanni Latifat, Enhancing Transparency in Educational Data Mining: Applying Explainable AI to Analyze Student Behavior and Learning Patterns , Communication In Physical Sciences: Vol. 13 No. 3 (2026): Volume 13 Issue 3
- Samira Sanni, A Review on machine learning and Artificial Intelligence in procurement: building resilient supply chains for climate and economic priorities , Communication In Physical Sciences: Vol. 11 No. 4 (2024): VOLUME 11 ISSUE 4
- Christianah Oluwabunmi Ayodele, Esther Oludele Olaniyi, Chukwuebuka Francis Udokporo, Applications of AI in Enhancing Environmental Healthcare Delivery Systems: A Review , Communication In Physical Sciences: Vol. 12 No. 5 (2025): VOLUME 12 ISSUE 5
You may also start an advanced similarity search for this article.



