Design and Implementation of a Low-Cost 3-phase Voltage Data Logger with Cellular IOT

Authors

  • Samuel Tsaku Aluma

    Department of Electrical/Electronic Engineering, Faculty of Engineering, Nasarawa State University, Keffi, Nigeria.
    Author
  • Kassam H. Danjuma

    TranESS C&I Department, Itel Energy, Kano, Kano State, Nigeria
    Author
  • Wutokkwatda Bayura

    Department of Maintenance and Engineering Skyway Aviation and Handling Company PLC Kano station, Kano State, Nigeria
    Author

DOI:

https://doi.org/10.4314/

Keywords:

Arduino Nano; cellular IoT; GSM; three-phase voltage monitoring; ThingSpeak; voltage data logger.

Abstract

This study presents the design, implementation and performance evaluation of a low-cost three-phase voltage data logger with cellular Internet of Things (IoT) capability for remote monitoring of electrical distribution systems. The system was developed using an Arduino Nano microcontroller (ATmega328P), three independent voltage-sensing channels, signal-conditioning circuits, a real-time clock, an SD-card storage unit and a SIM800L GSM module for wireless data transmission to the MathWorks ThingSpeak cloud platform. A rechargeable battery arrangement was incorporated to support system operation. The developed prototype was deployed on a 415 V three-phase distribution network to evaluate its voltage acquisition, local storage and remote communication capabilities. Experimental results showed that the system acquired between 5 and 12 readings per second, with an average sampling rate of approximately 8 readings per second. Analysis of the local measurements revealed channel mean values of 228.03, 227.07 and 227.90 on 8 October 2021, while measurements recorded on 11 October 2021 produced mean values of 235.50, 235.50 and 203.60, respectively, indicating a substantial difference in the third measurement channel. The cloud-based records also demonstrated successful transmission of three-channel voltage measurements, with 26 non-zero records from entries 130–159 producing mean values of 234.81, 233.50 and 234.15 across the three channels. During testing, transient current demand from the GSM module occasionally affected the power supply and SD-card recording. A 2200 µF capacitor was consequently connected across the 4 V supply and ground to improve transient current support. The results demonstrate that the developed system can provide affordable three-phase voltage-magnitude monitoring, timestamped local data storage and remote access to measurement records. The instrument offers a practical solution for preliminary distribution-network monitoring, although further calibration and power-supply improvements are required to enhance measurement reliability

Author Biography

  • Samuel Tsaku Aluma, Department of Electrical/Electronic Engineering, Faculty of Engineering, Nasarawa State University, Keffi, Nigeria.

     

     

Downloads

Published

2026-11-05

How to Cite

Design and Implementation of a Low-Cost 3-phase Voltage Data Logger with Cellular IOT. (2026). Communication In Physical Sciences, 13(12), 2046-2068. https://doi.org/10.4314/

Similar Articles

161-170 of 359

You may also start an advanced similarity search for this article.